Control Panel

GENERAL INFORMATION

Panel mounting is in progress; The location of electrical materials prepared in advance to be placed on the clipboard. Board materials to components to be assembled (screws, bolts, etc.) are sold together.

Electrical control panel are formed from the top and bottom. The upper part is there are areas in which to place the capacitor on the rails into the rack. The fuses are placed in the middle part of the dashboard bars and contactors. signal lights on the electrical panel covers is mounted. Electrical connection is made through the end of the signal light panel.

CONTROL PANEL SERVICES

Panel mounting is in progress; The location of electrical materials prepared in advance to be placed on the clipboard. Board materials to components to be assembled (screws, bolts, etc.) are sold together.

Electrical control panel are formed from the top and bottom. The upper part is there are areas in which to place the capacitor on the rails into the rack. The fuses are placed in the middle part of the dashboard bars and contactors. signal lights on the electrical panel covers is mounted. Electrical connection is made through the end of the signal light panel.

reactive power relay opened the front panel cover is inserted into the square. It remains outside the glass portion of the relay. It does not require screws. trapped part of the relay can be connected to the hair by printing with compression screws. Measuring instruments, ammeter, voltmeter, power factor meters of mounting is done with this method.

Installation is done in accordance with the contactor panel wiring diagram as well as the middle section of the rail on the power board. Compensation in the board scheme using soft insulating material is placed on the base board in a line. Put these insulating material between the capacitor from side to side. Capacitors heat they emit into the environment during their work. venting in order to be taken out of the heat generated in this panel.

We care details as well... Call us now!